On 17 April 2026 the Responsible Minerals Initiative released CMRT 6.6, EMRT 2.11 and AMRT 1.31 together (RMI MRT Introduction). This is the set to use for new supplier rounds in the current reporting year. Your due diligence duties did not change with the release. What changed is the file you send, the product fields on the CMRT, the geography labels, and the smelter lists embedded in each template.
Quick answer
RMI published CMRT 6.6, EMRT 2.11 and AMRT 1.31 on 17 April 2026. CMRT 6.6 adds Requester Product Number and Requester Product Name on the Product List, updates ISO short names for countries and regions, and refreshes the Smelter Reference List and Standard Smelter List. EMRT 2.11 and AMRT 1.31 mainly fix a date input issue on the Declaration tab, update the same ISO names, and refresh the same smelter lists. Use this set for new collection cycles. The next CMRT and EMRT releases are expected in Spring 2027. The next AMRT is expected in Fall 2026.
Who this is for: Compliance, procurement and sustainability teams that collect or file CMRT, EMRT and AMRT and need to know what to change before the next outreach round.
Not what you're looking for? This is not a full how-to for filling every tab. For that, see the CMRT reporting guide and the RMI Templates Guide. This is also not legal advice.
Get the RMI Templates Guide →What shipped on 17 April 2026
| Template | Version | What actually changed | Next release (RMI) |
|---|---|---|---|
| CMRT | 6.6 | Product List: Requester Product Number and Requester Product Name. ISO short names for countries, states and provinces. Updated Smelter Reference List and Standard Smelter List. Small functional changes that stay compatible with IPC-1755. | Spring 2027 |
| EMRT | 2.11 | ISO short names. Declaration tab date input fix. Updated smelter lists. Enhancements compatible with IPC-1755. | Spring 2027 |
| AMRT | 1.31 | ISO short names. Declaration tab date input fix. Updated smelter lists. | Fall 2026 |
CMRT 6.6 is the first update since CMRT 6.5 (25 April 2025). The older 6.x history still matters for reading legacy files. It is no longer the current release. See the CMRT 6.5 version history for what changed up to 6.5.
Download the files from the RMI site at the start of each cycle: CMRT, EMRT, AMRT. Confirm the release note on the RMI MRT Introduction. Do not reuse a saved copy from last year. An old file carries an old smelter list, and the Checker tab treats valid smelters as invalid for no sourcing reason.
Three things to be clear about
1. This is not a new methodology
No new minerals landed on the CMRT. It is still 3TG: tin, tantalum, tungsten and gold. EMRT still covers the extended set used for battery and energy-transition minerals (including cobalt, natural mica, copper, natural graphite, lithium and nickel). AMRT is still the flexible template for minerals outside those two scopes. For which template to send when, see CMRT vs EMRT vs AMRT.
No regulation names a CMRT version number. Customers, auditors and your own validation do. That is why the file version matters in practice even when the law does not.
2. The two new CMRT product fields are the only process change that hurts if you ignore them
The Product List now has Requester Product Number and Requester Product Name.
The failure mode these fields are meant to cut is familiar. The supplier completes the declaration against its own part numbers. Your team receives a technically complete CMRT that cannot answer which of your products it covers. Mapping then happens weeks later, by hand, against the bill of materials.
Requester-side identifiers move that mapping into the declaration. The useful habit is to put your numbers on the request before it goes out, not leave the fields blank and hope the supplier invents the right mapping.
RMI automation
Run CMRT, EMRT and AMRT in one workspace
Issue the current templates with your product identifiers already set, then consolidate what comes back.
3. Version drift still costs more than the update itself
Mixed versions across a supply base produce mismatched smelter IDs and Checker failures that look like sourcing problems and are often just age. Customers increasingly reject declarations that are not on the current set.
RMI has also noted that the smelter lookup list inside a released template is fixed at release and can lag the live Standard Smelter List. Where a smelter is missing from the embedded list, use the “Smelter not listed” path and keep a record of why.
If you have suppliers in China after the 5 August 2026 RBA designation, the template version is not the hard part. The hard part is which engagement routes still work. Using a reporting template is not the same as cooperating with the RBA. See the China RBA ban note for how to keep the inquiry running. The longer write-up is in the China RBA ban briefing.
On 19 August 2026 RMI also published versions of each MRT without RMI logos and branding. They are functionally identical to the April releases and sit on the same template pages (RMI MRT Introduction; downloads via CMRT, EMRT, AMRT).
What to do this cycle
- Download CMRT 6.6, EMRT 2.11 and AMRT 1.31 from RMI. Start from those files. Or take them together from the RMI Templates Guide.
- Update the version named in your supplier instructions and outreach email.
- Decide your acceptance policy in writing: require 6.6 for new CMRT filings, or accept 6.5 for a short transition and then cut off. State the date. Do not leave it implicit.
- Pre-fill Requester Product Number and Requester Product Name on outbound CMRT requests where you already know the mapping.
- Update any internal country or region mappings to the new ISO short names so roll-ups do not break on labels.
- Re-check open smelter IDs against the lists in the new templates before you chase suppliers for “invalid” rows that are only outdated references.
- Consolidate mixed versions before you build the master file. Age errors first, sourcing disputes second. For the step-by-step filing workflow, see the CMRT reporting guide.
What you end up with
A current template set for the reporting year, with product mapping that can survive a customer question about which SKU a declaration covers, and a smelter list that matches what RMI published in April 2026.
The work is still the same work: reasonable inquiry, OECD-aligned due diligence, and a record of what you asked and what came back. The April release does not rewrite that. It removes a few avoidable sources of rework.
For which template to send when, see CMRT vs EMRT vs AMRT. For the step-by-step filing workflow, see the CMRT reporting guide. For the line-by-line history through 6.5, see the CMRT 6.5 version history.
Frequently asked questions
What is the latest CMRT version in 2026?
CMRT 6.6, released by RMI on 17 April 2026, together with EMRT 2.11 and AMRT 1.31 (RMI MRT Introduction). That is the set to use for new supplier rounds. Download from RMI CMRT (and EMRT, AMRT).
What is the difference between CMRT 6.6 and CMRT 6.5?
CMRT 6.6 adds Requester Product Number and Requester Product Name on the Product List, updates ISO short names for countries and regions, and refreshes the Smelter Reference List and Standard Smelter List. It does not add new minerals or rewrite the due diligence questions. The path up to 6.5 is in the CMRT 6.5 version history.
Do I need EMRT 2.11 if I only file CMRT?
Only if extended minerals are in scope for your products or your customers. CMRT and EMRT run in parallel. One does not replace the other. See CMRT vs EMRT vs AMRT.
Can suppliers still submit CMRT 6.5?
They can, and many will. The file remains readable. Smelter references may fail validation against the newer lists, and some customers will reject anything below 6.6. Decide your cut-off date and put it in the request.
Where do you download the templates?
From the Responsible Minerals Initiative website, free of charge. Start at the RMI MRT Introduction, then download CMRT, EMRT and AMRT. Or use the RMI Templates Guide. Start each cycle from a freshly downloaded file.
Does the China RBA decision change which version to use?
No. The version question is separate from which engagement routes Chinese suppliers can use. Keep due diligence running; choose the template set above; see the China RBA ban note for the process constraints.
When is the next RMI template update?
RMI expects the next CMRT and EMRT in Spring 2027, and the next AMRT in Fall 2026. Confirm on the RMI site before you lock next year’s calendar.



